The Extension, Phase Two

Planning

The planning of Phase Two has begun.  The outline plan being that the railway would run down the garden close to or through the boarder, and around the back of the seat arbour.  Unlike Phase One, which was planned in detail to fit in a defined space, Phase Two will be more fluid, meandering as the existing garden allows.

The start of Phase Two are the tracks in red, to lead down the garden
The red line shows the path that Phase Two will take, and the seat arbour in the distance

Hopefully I will be able to take you through each stage of the developments, with live updates.  However, with autumn here, and winter drawing in, the main work will start in the spring.